Part A · What happens to the load at your site

For
Sites receiving waste
Covers
R1 to R13, D1 to D15
Checked
12 OCTOBER 2026

Which R or D code am I? Recovery and disposal codes by type of site

Every load you report to Defra needs a recovery (R) or disposal (D) code. It describes what your site does with that load, not what the producer did. Your permit already lists the ones you're allowed.

Start
Your environmental permit. The table of permitted activities, often near the front, names the R and D codes your site may carry out.
Rule
The code on each load must be one your permit allows, and it describes what you do with that load.
Most yards
Store and send on: R13 (for recovery) or D15 (for disposal). Sort or crush first: R12 or R5.
Format
On Defra's spreadsheet each code carries its weight, like R13 = 4.2 = Tonnes = No. Software does this for you.

The usual code, by type of site

These are the codes most sites of each kind use. They are a starting point, not a ruling: your permit decides. If your permit lists different codes, your permit is right and this table is wrong for you.

Your siteUsual codeWorth knowing
Skip hire yard or transfer station: you store mixed waste and send it onR13 if it goes on for recovery. D15 if it goes on for disposal, such as landfill.Storage pending recovery (R13) or disposal (D15).
Transfer station that sorts, separates, crushes or bales before sending onR12 for sorting and the like before recovery elsewhere. D13 or D14 before disposal.The R12 note in the law covers pre-processing such as sorting, crushing and baling.
Metal recycling site or scrap yardR4 for recycling or reclaiming metals. R13 if you only store it before it goes on.Your permit will say whether your site does R4 or only stores.
Vehicle dismantler (ATF)R4 for dismantling and recovering metals. R13 for storage before it goes on.
Inert or aggregate recycling: crushing concrete, brick, tarmac, soilR5, recycling of other inorganic materials.Street sweepings or planings you only store and send on are R13, not R5.
Composting siteR3, recycling of organic substances, which includes composting.
Anaerobic digestion (AD) plantR3 for digestion of organic waste.Check your permit; some list R1 too.
Landspreading or a mobile plant deploymentR10, land treatment for the benefit of agriculture.
LandfillD1, deposit into or onto land, or D5, specially engineered landfill.

Your type of site in more detail, with the codes English sites really used in 2024: Skip hire and transfer stations · Scrap metal and vehicle dismantlers · Anaerobic digestion and biogas · Composting · Inert, soil and quarries · Wood recycling · WEEE · Tyres · Hazardous waste and consignment notes · Landfill.

The mistake people make most

Using the code for what will happen to the waste in the end, at somebody else's site. If a load of road sweepings comes in, sits in a bay and goes on to a recycler, your site stored it: that is R13, even though it will be recycled later. The recycler puts R5 on it when it reaches them.

The second most common: one code set for the whole site and never changed, when some loads go on for recovery and some for disposal. Each load gets the code that is true for that load.

All thirty codes, in plain English

Recovery: R1 used as fuel · R2 solvent reclamation · R3 recycling organic substances (composting, digestion) · R4 recycling metals · R5 recycling other inorganic materials (aggregates, soil, glass) · R6 regenerating acids or bases · R7 recovering pollution abatement components · R8 recovering catalyst components · R9 oil re-refining · R10 land treatment benefiting agriculture · R11 using wastes from R1 to R10 · R12 exchange of wastes, including sorting and pre-processing, before R1 to R11 · R13 storage before R1 to R12. Annex II

Disposal: D1 deposit into or onto land · D2 land treatment · D3 deep injection · D4 surface impoundment · D5 specially engineered landfill · D6 release into water · D7 release into seas · D8 biological treatment · D9 physico-chemical treatment · D10 incineration on land · D11 incineration at sea · D12 permanent storage · D13 blending or mixing before D1 to D12 · D14 repackaging before D1 to D13 · D15 storage before D1 to D14. Annex I

Straight answers

Questions people ask

What does R13 mean on a waste record?

Storage of waste before it goes on to be recovered somewhere, by you later or by another site. Most skip hire yards and transfer stations that store waste and send it on use R13.

What is the difference between R13 and D15?

Both mean you stored the waste. R13 is storage before recovery, such as recycling. D15 is storage before disposal, such as landfill. Use the one that is true for where that load is going next.

Where do I find which R and D codes my site is allowed?

In your environmental permit, in the table of permitted activities. The code on each load must be one your permit allows.

Which R code for crushing concrete and brick into aggregate?

Usually R5, recycling of other inorganic materials. If you only store the material before sending it on, it is R13.

Which R code for landspreading?

R10, land treatment resulting in benefit to agriculture or ecological improvement.

Which code for composting or an AD plant?

Usually R3, recycling of organic substances, which covers composting and other biological processes such as anaerobic digestion. Check your permit.

Can one load have more than one R or D code?

Yes. A load can carry more than one, each with its own weight, if part of it is recovered and part disposed of. Each waste item carries the code that is true for it.

Want this done for you at the gate?

Byrne Waste Tracking runs in the browser on a phone at the gate, with nothing to install. It remembers your carriers and their numbers, offers the waste codes and R or D codes your site uses, checks each load against Defra's rules before it saves, and sends it to Defra automatically once you've linked your Defra account. Byrne Digital Solutions is listed on GOV.UK as a compatible software provider.

£89 per site per month, no contract. Join before 1 November 2026 and nothing is due until 1 November; join from 1 November and you get 14 days free. After that it's £89 a month per site, and there's no card to enter until you start it. No setup fee when you set it up yourself. If a consultant introduces you, any setup fee is agreed through them and you see the amount before you pay anything.

A site in Scotland or Northern Ireland that joins before 1 January 2027 pays nothing until 1 January 2027, the day the duty starts there.

Got a waste consultant? Ask them about Byrne first: they can introduce you, your site is set up for you, and it shows on their Clients screen. How that works.

Already a customer? Open the app. Stuck on something here? Email wilf@byrnedigitalsolutions.co.uk - email is the quickest way to reach me, and I reply the same working day.

Related